Read the whole offer.
Compare crating, testing and port terms beside unit area or tonnage rates.
Place FOB/CIF assumptions, A-frame timber charges, moisture liners, third-party lab testing and single-lot overages next to every square-metre or metric-tonne quote.
THE WORKING PARTS
- Like-for-like unit comparisons
- Packing & ISPM-15 timber inclusions
- Batch lock & revision tracking
Benchmark identical unit bases
Natural slabs quote per square foot or square metre; tiles sell by net covered box area; quartz grit trades by dry metric tonne. Ensure all offers convert to the same clean landing basis.
Surface packing and lab fees clearly
Timber A-frames, extra edge boards on tile pallets, FIBC liners and EN/ISO lab testing cost real money. Separate included vs optional items honestly across competing proformas.
Anchor changes to dated revision numbers
Switching granite finish from polished to leather or tightening silica moisture ceilings affects cost and lead time. Document every accepted change with clear dates.